The training fleet parked in a long line on the ramp at first light, twin-engine aircraft nearest the camera.
Van Nuys Airport (KVNY) · Part 61

Airline Pilot Training In Los Angeles, Priced Before You Start

A phased route from no logbook at all to a commercial certificate and an instructor rating, flown at Van Nuys. Each phase names its aircraft, its hours and its price before you sign anything.

$89,000 zero to a working certificate355 measured flyable days11 instructors$179/hr wet, single-engine
355flyable training days a year, measured at Van Nuys
11instructors, each commercial or ATP with a current CFI
6aircraft types, owned and maintained in-house
$179an hour wet, single-engine, inside every enrolled program
Who This Is Built For

Is This School For Someone Changing Careers Into Flying?

Yes, and that reader is the reason it exists. You are probably employed, in your thirties or forties, and doing arithmetic rather than daydreaming. You want to know how many months you lose, what the total is before you sign anything, what happens if the money runs out at 180 hours, and whether a medical examiner can end the plan before it starts.

Those four questions organise the whole site. The sequence leads, not the scenery: private certificate first, instrument rating second, then commercial, then the multi-engine class rating, then the instructor rating — an order fixed by regulation rather than by taste. The airline pilot training program sets out every rung with its hours and its price.

What this site will not do is dress the arithmetic up. Training two evenings a week is the most expensive way to earn a certificate and it is also the most common. Currency decays between lessons, you re-fly ground you already covered, and the hours quietly inflate past the regulatory minimum. That cost is real and the full-time versus part-time page puts numbers on it.

We train under 14 CFR part 61. Your syllabus is built around the aeronautical experience requirements in that part rather than around an FAA-approved course outline, which is why a phase can be compressed when you are ready and stretched when you are not. Part 61 training structure explains what you give up in exchange.

A wide view across the Los Angeles basin at dusk from a training aircraft, the street grid stretching to the mountains.
The Sequence

What Order Do The Certificates And Ratings Go In?

Five rungs, and the order is fixed by regulation rather than preference. Each one is a prerequisite for the privileges of the next.

1

Private Pilot Certificate

14 CFR 61.109(a) puts the private pilot floor at 40 logged hours. Ten of those are solo, and one solo leg has to cover 150 nautical miles with three full-stop landings at three points. Almost nobody finishes at 40. AOPA puts the national figure at 50 to 70 hours, and your tempo decides where inside that you land.

2

Instrument Rating

An instrument rating wants 50 hours of cross-country as the pilot flying, plus 40 hours under a hood or in cloud, of which an instrument instructor has to deliver 15. That is 14 CFR 61.65(d). It is the rung the rest of the ladder bolts to, because an airline transport pilot certificate is built on top of it.

3

Commercial Certificate

The commercial certificate sits at 250 logged hours under 14 CFR 61.129(a). Inside that: 100 hours as pilot in command, ten hours of training in an airplane that is complex, turbine-powered or technically advanced, and a 300 nautical mile cross-country whose furthest point is at least 250 nautical miles from the departure field.

4

Multi-Engine Class Rating

A class rating added to a certificate you already hold carries no hour minimum at all under 14 CFR 61.63(c). An endorsement and a practical test are the whole requirement. That is why this rung is short, why it costs $5,100, and why the Piper Seminole is the airframe it is flown in.

5

Flight Instructor Rating

14 CFR 61.183 asks for eighteen years of age, a commercial or ATP certificate, an instrument rating, a pass on the fundamentals of instructing knowledge test, and fifteen hours commanding the category and class you intend to teach. This is the rung that starts paying you back.

Tempo

How Much Does The Weather Actually Cost You Here?

About ten training days a year if you fly four times a week, and almost nothing if you fly once. Van Nuys returned 355 training-capable days across the twelve months ending 1 August 2026 — days on which four daylight hours cleared a 3,000 ft ceiling and five statute miles of visibility, counted from NOAA ASOS observations.

That figure matters far more to a full-time student than to a weekend one. At four flights a week you are exposed to the calendar constantly and the ten lost days are real. At one flight a week the weather is not the bottleneck — your own currency is, and no amount of clear sky repairs that.

There is a genuine downside on the other side of the same measurement, and the instrument pages state it rather than bury it: a field this reliably clear hands you very little actual instrument meteorological condition to log. Most of your instrument training will be flown under a view-limiting device, and the page on actual IMC says what to do about that.

The hour of the day matters too. In June, 40 per cent of the 7am observations met training minima against 93 per cent at 11am. If dawn in early summer is your only free slot, that is worth knowing before you build a year around it. The flying days page publishes the method and the month-by-hour matrices.

Twin-engine and single-engine training aircraft parked on the ramp with the mountain line behind at first light.
Courses And Pricing

Every Course We Teach, And What Each One Costs

Course prices are packages rather than hourly rates: the aircraft, the fuel, your instructor, the ground instruction and the simulator time are all inside the figure. Van Nuys Airport, KVNY. Financing opens at $2,500 down. Read the financing routes →

Every figure above is the enrolment figure for the content that course states, and none of them is a range. Books and training materials sit inside every private pilot program. One Redbird MCX session bought on its own is $189. No hourly figure is published for the twin, and none for the Cirrus SR22 Turbo either — those two are bought as the $5,100 rating and as the $22,500 program instead. Examiner fees, knowledge test fees, your medical examination and your own equipment are set by other people and priced nowhere on this site.

The Decision Most People Face

Which Private Pilot Route Should You Buy?

Comprehensive, unless you have a reason not to. It is priced against 60 logged hours and 60 is roughly where an ordinary student finishes; Standard is priced against the regulatory floor of 40, which very few people reach in 40.

Standard Private Pilot

$10,900

Built to the regulatory minimum in 14 CFR 61.109(a). Right for a student who can fly most days.

  • 40 hours logged
  • 38 hours single-engine
  • 2 hours Redbird MCX
  • 30 hours dual
  • 3 hours ground
  • Books and materials included
Read The Private Pilot Syllabus
The One Most People Take

Comprehensive Private Pilot

$15,900

Sixty hours logged, which is where an ordinary student on an ordinary schedule actually arrives.

  • 60 hours logged
  • 55 hours single-engine
  • 5 hours Redbird MCX
  • 50 hours dual
  • 10 hours ground
  • Books and materials included
Read The Private Pilot Syllabus

Premium Private Pilot

$22,500

Forty hours logged, every one of them in the Cirrus SR22 Turbo, on a glass panel from lesson one.

  • 40 hours in the Cirrus SR22 Turbo
  • 2 hours Redbird MCX
  • 30 hours dual
  • 3 hours ground
  • Glass cockpit throughout
  • Books and materials included
Compare The Three Routes
One hourly figure is published on this site and only one: $179 wet for a single-engine airplane, available to students already enrolled. It buys the airframe and the fuel that goes through it, and not the person in the right seat — instruction is paid for out of the program price. Do not confuse the simulator hours above with the ground hours; they are different things and both figures are correct. One Redbird MCX session bought on its own is $189, and every ratings price sits on the pricing page.
The Ramp

What Do You Actually Fly Here?

Six airframe types, every one of them owned by the operation rather than leased in for the afternoon. Two Piper trainers, the Warrior and the Arrow II. A Diamond DA20 and a Cessna 162 Skycatcher. A Cirrus SR22 Turbo, which is the Premium program's airplane. And the Piper Seminole twin. Ownership is not a boast, it is a scheduling fact: the maintenance calendar belongs to us, so the 100-hour inspection that 14 CFR 91.409(b) requires lands where we put it rather than where a lessor does.

The spread matters more than the count. A student who trains on one airframe and then meets a second one at the commercial stage has to spend hours relearning a panel. Here the Warrior and the DA20 carry conventional round instruments, the Cirrus carries a glass primary flight display, and the Arrow II adds a constant-speed propeller and retractable gear for the complex endorsement in 14 CFR 61.31(e).

The Seminole is the twin, and it is the reason the multi-engine class rating is a short phase rather than a new course. The Cirrus is the Premium program's airplane and it carries a whole-airframe parachute system. Neither of those two has a published hourly figure anywhere on this site, because neither is sold by the hour.

One full-motion simulator sits alongside them. The Redbird MCX is fully enclosed, weather never cancels it, and it is the least expensive place in the building to learn a procedure and the worst one to learn a landing. We spend its hours on scan, radio work and emergencies, and the simulator page is specific about which lessons belong in it.

Cessna 162 SkycatcherPiper WarriorPiper Arrow IIDiamond DA20Cirrus SR22 TurboPiper SeminoleRedbird MCX
A Piper Seminole twin-engine trainer on an open ramp at first light with mountains on the horizon behind.
How This Place Is Set Up

What Is This School Actually Built To Do?

Seven things, stated as design decisions rather than as promises. Each one has a cost attached, and the cost is named.

🎯

Move One Person To A Working Certificate

The operation is organised around the career route rather than around sightseeing. That is why the ratings pages read like syllabi and why the hour-building problem gets its own page instead of a footnote.

💵

Publish The Whole Price, Once

Every course figure is on the site as a single number. The trade is that a fixed price is set against a realistic hour count rather than the regulatory floor, so a naturally quick student subsidises a slower one a little.

🛩️

Own The Aircraft, Not Rent Them

Six types on our own books. The cost of that decision is capital tied up in airframes; the benefit is that the maintenance calendar and the schedule belong to the same people.

🧑‍✈️

Keep Eleven Instructors On The Roster

Enough that one full calendar does not stall your training, and enough that you can change instructor without changing school. Ask early if the fit is wrong; a poor match costs money every hour it goes unsaid.

📐

Teach To The Regulation, Not To A Feeling

Every requirement quoted on this site names the paragraph it comes from. If a claim has no citation it is either an opinion, and labelled as one, or it is not here.

🌤️

Use A Field That Flies

355 training-capable days a year, measured rather than asserted. The cost is that actual instrument conditions are scarce here, which is a real weakness for an instrument student and is stated as one.

🚫

Publish No Reviews And No Pass Rates

The business is new. A rating average, a pass rate or a graduate count taken from a handful of students would be noise dressed as evidence, and borrowing anybody else's would be worse.

What We Can Show You

What Can A School That Opened This Year Actually Prove?

Not much, if the proof has to be a review count. So here is the substitute: five things a stranger can check today, each with its source named beside it.

6

Aircraft Types, On Our Own Books

Cessna 162 Skycatcher, Piper Warrior, Piper Arrow II, Diamond DA20, Cirrus SR22 Turbo and Piper Seminole. We own them and we maintain them; nothing here is chartered in from a broker for the afternoon.

Inspected under 14 CFR 91.409(b)
11

Instructors On The Roster

Every one of the eleven holds a commercial certificate or better, an instructor certificate on top of it, and a current medical. Your instructor signs as pilot in command on every flight, because the regulation requires it.

14 CFR 61.183 · 61.23
$189

One Redbird MCX Session

Full-motion, fully enclosed and never scrubbed for weather. Two of those sessions sit inside Standard and Premium and five inside Comprehensive, and the ground hours are a separate thing entirely.

Published, not quoted on request
355

Training Days The Weather Allowed

Counted from NOAA ASOS observations at Van Nuys over the twelve months ending 1 August 2026. A day scored only where four daylight hours cleared a 3,000 ft ceiling and five statute miles of visibility.

NOAA ASOS via the Iowa Environmental Mesonet
$0

Prices Kept Off The Page

None. Every course figure is published here, with no ranges, no block-rate arithmetic and no request-a-quote form standing between you and the number you will actually pay.

Published in full
What It Costs, Cumulatively

How Much Does The Whole Route Cost At Van Nuys?

$89,000 buys the entire sequence as one program. Bought a rating at a time, the same ladder is a running total you can watch climb, which is the honest way to look at it.

The Ladder, With A Running Total

PhaseWhat You Hold At The EndProgramPriceRunning Total
1Private pilot certificateComprehensive Private Pilot$15,900$15,900
2Instrument ratingInstrument Rating$11,700$27,600
3Commercial certificateInside the career track
4Multi-engine class ratingMulti-Engine Add-On$5,100
5Flight instructor ratingInside the career track
All fiveA certificate that earns moneyZero To Airline$89,000$89,000
The Working Week

What Does A Week Of Flight Training Actually Look Like?

Three to four flights, two ground sessions and about six hours of reading, if you are training full time. The shape of the week is the single largest lever you have over both the duration and the total.

View from the cockpit of a training aircraft over Santa Monica Bay at sunset, the glare shield and panel in the foreground.

A Full-Time Week

Four flights, each about two and a half hours of your day for ninety minutes airborne once the preflight, the taxi and the debrief are counted. Two ground sessions on top, and the reading that goes with the next two lessons. Most students find the reading, not the flying, is the part they underestimate.

At that tempo the private certificate takes roughly two to three months and the whole sequence to a flight instructor rating runs about twelve to eighteen. Then the hour-building to 1,500 sits on top of it, which is its own project and has its own page.

  • 3 to 4 flights a week
  • 2 ground sessions
  • About 6 hours of private study
  • Currency never has time to decay

A Working Person's Week

Two flights if the calendar is kind, one if it is not, plus weekend ground work. This is the most common shape and it is the expensive one. The mechanism is currency decay: skills fade between lessons, so part of every flight is spent recovering ground you had already covered, and the hours creep past the minimum.

It is entirely doable and thousands of people do it. It just wants planning — front-load the knowledge test, book recurring slots rather than asking each week, and use the simulator when the calendar rather than the weather is the problem. The page on training while working is specific about the tactics.

  • 1 to 2 flights a week
  • Recurring slots rather than ad-hoc booking
  • Knowledge test taken early
  • Redbird MCX to hold currency

What Fills The Time That Is Not Flying

Ground instruction, which is a scheduled lesson rather than homework; the knowledge test preparation for whichever certificate you are on; weight and balance and performance planning for the next flight; and, from the cross-country phase onward, real route planning against real weather.

The density altitude problem at this field belongs in that planning rather than in a paragraph of marketing. Van Nuys sits at 802 ft, but at 100°F in September the airplane behaves as though the runway sat at about 4,100 ft. 14 CFR 91.103 makes working that out before you go a duty rather than a courtesy.

The Field

Why Van Nuys And Not A Quieter Airfield?

Because the airspace you will spend your career in starts on lesson one instead of being bolted on afterwards. Van Nuys runs a control tower inside Class D, and the whole field sits beneath the Class B shelf that wraps Los Angeles International. You are talking to a controller from your first taxi call.

That is a genuine advantage and it is one of the few this site will claim. A student who learns at an untowered field has to add radio work, sequencing and clearance-reading later, usually in a hurry and usually just before a checkride. Here it is ambient. The cost is that your early lessons are busier, and some people find the first three hours overwhelming.

The field elevation is 802 ft above mean sea level, which sounds like a footnote and is not. On a hot September afternoon the density altitude runs to roughly 4,100 ft, and the airplane climbs like it. Learning to compute that and to plan around it is a habit you keep, and it is exactly what 14 CFR 91.103 asks of a pilot in command.

Everything else the field gives you is scenery, and scenery does not earn a paragraph. What matters is the airspace, the tower, the density altitude and the 355 training-capable days. Those four things are why the school is here.

The downtown Los Angeles skyline seen from a training aircraft in flight, with the propeller and engine cowling in the foreground.
Before You Spend Anything

Come And Walk The Line First

A ramp is far easier to judge in person than in a photograph, and an hour on the field tells you more about how a school runs than any page can.

Three single-engine training aircraft parked nose-out in front of an open hangar.

You are welcome to come and look at the aircraft before you book anything at all. Bring the awkward questions. Ask what the airframe times are, ask who signs the maintenance, ask how many students each instructor is carrying, and ask what happens when a lesson is cancelled for weather.

The same visit is the right time to ask for the two documents worth reading before any money moves: the syllabus for the program you are considering, and the training agreement with its refund terms. Both exist and both are handed over before payment rather than after it.

  • The Aircraft

    Six types on the ramp, and you can look inside any of them. The panels differ deliberately, and seeing a round-gauge Warrior beside the Cirrus explains the Premium program faster than a page of copy.

  • The Simulator

    The Redbird MCX is fully enclosed and full-motion. Sit in it. It is the fastest way to understand why a $189 session buys a different kind of hour to a $179 one.

  • The People

    Eleven instructors, all of whom hold a commercial certificate or an ATP with an instructor certificate on top. Ask which one you would be matched with and why.

  • The Paperwork

    The syllabus and the training agreement, before you pay. Read the refund terms on the page, then read them again in the agreement, and ask about anything the two do not both answer.

Send An Enquiry
Starting

How Do You Actually Begin?

Four steps, and the first two cost less than one per cent of a career route between them. They are also the only two that can end the plan, which is why they come first.

1

Fly One Hour

$229 for sixty minutes of dual instruction with you handling the airplane, and a written read at the end. It is logged, it counts toward aeronautical experience, and the full fee is credited to your program if you enroll inside a day.

2

Sit The Medical Examination

With an Aviation Medical Examiner, ideally in the same fortnight. Take the highest class you might ever need. A condition nobody knew about is the cheapest thing to discover in month one and the most expensive to discover at the point of first solo.

3

Choose The Route And The Tempo

Which certificate, which program, and how many flights a week you can genuinely commit to. The second half of that sentence governs both the duration and the total far more than the first half does.

4

Enroll And Book The Slots

Financing opens at $2,500 down. You are matched to an instructor and given recurring slots, and the syllabus and the training agreement are handed over before payment rather than afterwards.

Common Questions

Questions People Ask Before They Enroll

Van Nuys Airport (KVNY) in Van Nuys, California, at 802 ft above mean sea level. The field runs a control tower inside Class D airspace and sits underneath the Los Angeles International Class B shelf. Radio work and airspace begin on the first lesson rather than being added later.

$89,000 buys the whole sequence as one program, from no logbook to a commercial certificate and an instructor rating. Bought a rung at a time the figures are these: a private certificate at $10,900 on Standard, $15,900 on Comprehensive or $22,500 on Premium; the instrument rating is $11,700, and adding the multi-engine class rating costs $5,100. Financing opens at $2,500 down.

No. Training here is under 14 CFR part 61. A part 141 school runs an FAA-approved course outline with a fixed lesson order; a part 61 school builds to the same aeronautical experience requirements with the freedom to reorder them. The trade is real in both directions and it is set out on the part 61 training structure page.

14 CFR 61.159(a) sets the unrestricted floor at 1,500 total hours as a pilot. The restricted-privileges route in 14 CFR 61.160 lowers that to 1,000 hours behind a qualifying bachelor's degree, 1,250 behind a qualifying associate's degree, and 750 for a former military pilot. Both front seats in a part 121 operation need an ATP certificate and a type rating, which is what 14 CFR 121.436(a) requires.

$179 the hour, wet, in a single-engine airplane, and only for enrolled students. It buys the airframe and the fuel that goes through it. Instruction is paid for out of the program price rather than out of that figure, and neither the Piper Seminole nor the Cirrus SR22 Turbo carries a published hourly figure at all.

Get one early, even though training can begin without it. Under 14 CFR 61.23 a first-class medical is what airline transport pilot in command privileges require, and past your fortieth birthday that certificate holds those privileges for six months rather than twelve. Solo arrives about a third of the way through a private course and a deferral discovered then stops the syllabus dead.

Flying most weekdays, the sequence from zero hours to a flight instructor rating runs roughly twelve to eighteen months, and the hour-building toward 1,500 sits on top of that. Two lessons a week turns the same sequence into several years. Tempo is the single largest variable and you control most of it.

One hour in the airplane with an instructor, at $229, logged as dual received. You fly it. The instructor writes down what they saw and gives you a straight answer on whether the schedule in your head is realistic. Enroll inside a day of flying it and every dollar of the $229 is credited to whichever program you choose.

Yes, and it will cost more and take longer. Currency decay between lessons is the mechanism and it is not a small effect: part of every flight goes on recovering ground already covered. The page on flight training while working full time sets out how to structure it so the damage is smallest.

No. This business opened recently, has no reviews of its own, and will not display anybody else's. There is no pass rate, no graduate count and no safety-record claim anywhere on this site. The five checkable standards above are what is offered in place of them.

Yes for the private certificate, the instrument rating and the multi-engine class rating, which are sold individually at published prices. The commercial and instructor phases are priced inside the $89,000 route, because what they cost on their own depends entirely on what you already hold when you start them.

Additional flying bills at the published $179 wet single-engine rate. What additional instruction costs is not published on this site, and rather than invent a figure the gap is named here and on the terms page. Ask for it in writing before you enroll, and put the same question to every other school you are considering.

Start With One Hour

Fly It Once Before You Decide Anything

Nothing on this page settles whether you will enjoy the work, take instruction well, or hold up in an aircraft that is moving. An hour settles all three. Book it, fly it, read the written debrief, and then decide with something concrete in front of you. Enroll inside a day and the $229 is credited to your program in full.

See Every Program Price
Assessment Flight
$229
Sixty minutes, logged as dual instruction, credited against any program you enroll in within a day.
Or call (747) 688-9988
Before you spend anything

Fly The Aeroplane Once, Then Decide

The assessment flight is the first hour of the syllabus and a two-way evaluation. You fly it from the left seat with an instructor beside you, they write down what they saw, and you get an honest read on whether the plan is realistic. It is loggable, and it is credited in full against enrolment if you enroll within 24 hours.

Call (747) 688-9988 Text (747) 688-9988

What happens on an assessment flight →

6 aircraft types, owned in-house 355 flyable training days, measured at Van Nuys Every price published on the page
(747) 688-9988 · text
Assessment flight
$229
60 minutes, left seat, loggable. Credited in full against enrolment within 24 hours.