A Piper Seminole multi-engine trainer photographed from the wingtip in bright midday sun outside the hangars at Van Nuys
Van Nuys Airport · KVNY · Consecutive Days

Accelerated Multi-Engine Training

Ten to fourteen consecutive days, one airplane, one instructor, and nothing waiting at a testing centre. The twin rating is the rating best suited to being flown in a single block, and this page explains why that is a fact about the syllabus rather than a sales line.

Ten to fourteen consecutive daysNo knowledge test standing in the way$5,100 whatever tempo you fly it at355 training days a year at this field
10–14consecutive days for a typical twin rating
0knowledge tests to sit before the practical
355training days a year measured at this field
$5,100the price, at any tempo you choose
The Definition

Accelerated Multi-Engine Training: What Is Being Compressed?

Flying the twin every day, or close to it, until the rating is finished. For most people that is ten to fourteen consecutive days from the first lesson to the practical test. The word describes a schedule and nothing else. It is not a discount, it is not a shortcut, and the standard an examiner applies on day twelve is exactly the standard applied to somebody who took four months.

What makes the compression possible here is regulatory rather than promotional. 14 CFR 61.63(c) sets no training-time minimum for an added class rating, so there is no federal hour count you have to run down before an examiner will see you. And where an airplane rating already sits on your certificate at that level, 61.63(c)(4) removes the extra knowledge test entirely, so there is nothing to schedule, sit and wait on. Remove the written and you have removed the single largest source of calendar delay in every other rating on the route.

So the limiting factor becomes you, the weather, and the examiner's diary. Those are honest constraints and we will not pretend otherwise: a fortnight is a shape, not a promise, and anyone offering you a guaranteed finishing date for a flying course is describing a wish.

A schedule, not a discount61.63(c): no hour floor61.63(c)(4): no written
A Piper Seminole twin-engine trainer parked among the training fleet in late evening sunlight
Why This Rating

Why Does The Twin Suit A Compressed Block Better Than Other Ratings?

Because almost everything in it is a motor skill under time pressure, and motor skills under time pressure are built by repetition close together. A private certificate is mostly knowledge and exposure, which tolerate gaps. An engine failure drill does not.

Think about what the syllabus is really asking you to build. Recognising an asymmetry in the first second. Getting the correct foot down before the nose has moved far. Reaching for one propeller control rather than the other, correctly, when both look identical and one of them is keeping you alive. None of that is understanding. All of it is a rehearsed response, and rehearsed responses decay measurably between sessions.

There is a second reason, and it is about the airplane rather than about you. The Seminole is a system-dense machine compared with a single: two of most things, plus crossfeeds, plus a feathering mechanism and an accumulator, plus an electrical layout where the question of which bus survives which failure has a real answer. Holding the whole picture in your head is much easier when the picture was assembled last night rather than a fortnight ago.

The honest cost of the compressed route is fatigue. Two flights a day on top of ground work wears people down, and asymmetric handling is the last subject anybody should be learning while worn down. We would rather scrub an afternoon than fly a session you will not retain, and if your progress says slow down then the schedule slows down. The price does not move when it does.

Skill Decay

What Happens To Engine-Out Handling Between Sessions?

It fades, and it fades in a specific order. Knowledge lasts. You will still be able to explain, three weeks later, why a windmilling propeller costs you so much. What goes first is the speed of the response, and after that the sequencing — the reflex that puts the correct pedal down before the brain has finished forming a sentence.

That matters more here than in any other rating because the consequences are asymmetric. In a single, hesitating for two seconds costs you altitude. In a twin below blue line with a propeller windmilling, two seconds of hesitation is how a controllable situation becomes an uncontrollable one, and the NTSB's safety alerts on one-engine-inoperative accidents read as a catalogue of exactly that delay.

So the argument for consecutive days is not that it is convenient. It is that a drill flown on Tuesday and repeated on Wednesday is a different quality of drill from one flown on Tuesday and repeated a fortnight later. If your circumstances only allow weekends, the rating is still entirely achievable — it will simply take more total flying to reach the same standard, which is something we would rather flag at enrolment than at the point where it begins costing you money.

A Piper Seminole on an open ramp at first light with mountains on the horizon behind
The Shape

What Does An Accelerated Twin Course Look Like Day By Day?

A representative schedule rather than a timetable. Weather, examiner availability and your own progress all move it, and we would rather describe the shape honestly than print days you can hold us to.

1

Days One And Two — Systems And The Ground

Fuel, electrics, hydraulics, propeller governors, the feathering mechanism and the accumulator that brings a feathered blade back. A twin carries two of most things plus crossfeeds and interconnections a single never needed, and the oral portion of the practical test lives almost entirely in this material.

2

Days Three And Four — The Airplane As An Airplane

Taxi, takeoff, climb, cruise, circuit, landing, and the gear and propeller flows until they stop needing thought. This takes less time than most people brace for. A Seminole flies like an airplane, and ordinary handling is not where the difficulty hides.

3

Days Five To Nine — Failures, Repeatedly

Identify, verify, feather, secure, at altitude, then again with the instructor choosing the moment rather than announcing it. This is where the hours actually go, and where you find out why the checklist is ordered the way it is instead of some other way.

4

Days Ten And Eleven — V_MC And Single-Engine Approaches

The control demonstration flown high, with the FAA's Airplane Flying Handbook directing that the manoeuvre be set up at least 3,000 feet above the ground. Then approaches flown on one engine, plus the single-engine go-around that gets discussed on the ground rather than demonstrated in the airplane.

5

Days Twelve To Fourteen — Rehearsal, Then The Test

One full dress rehearsal flown with an instructor who has not been teaching you, which catches the habits your own instructor has stopped noticing. Then the designated pilot examiner: the endorsement 61.63(c)(1) requires goes in the logbook first, and 61.63(c)(2) is the test itself.

Limits

What Can Be Compressed, And What Cannot?

Most of the syllabus responds well to being flown close together. Three parts of it resist compression for reasons worth understanding before you book time off work, and a school that pretends otherwise is selling you a calendar rather than a rating.

A Piper Seminole twin-engine trainer seen side-on beside the hangar wall in clear early light

Systems Knowledge Compresses Well, But Only With Homework

Two days of ground instruction can cover a light twin's systems properly, but only if the evenings are used. The people who finish comfortably are the ones who read the flight manual in the hotel rather than at the airport. The people who struggle are the ones who assumed the ground portion was a formality standing between them and the airplane.

  • Fuel system, crossfeed logic and what each tank actually feeds
  • Electrical layout, and which bus survives which failure
  • Propeller governors, feathering, and the unfeathering accumulator
  • Landing gear extension, and the emergency method

Failure Recognition Compresses Best Of All

This is the part that genuinely improves under a compressed schedule, for the reason set out above: repetition close together builds a reflex, and spacing it out does not. Five consecutive days of failures produces a faster and cleaner response than the same number of failures spread over five weekends, and every instructor who has taught both tempos will tell you the same thing.

Weather And The Examiner Do Not Compress At All

Neither answers to a syllabus. Van Nuys is unusually generous here — NOAA ASOS observations over the twelve months ending 1 August 2026 put 355 days a year above 3,000 ft of ceiling and 5 sm of visibility across four qualifying daylight hours — but generous is not the same as guaranteed, and a marine layer that refuses to burn off is a real thing in June.

Examiner availability is the other hard constraint. We book the practical test as early as the syllabus sensibly allows and we will tell you the date we are aiming at, but a designated pilot examiner runs an independent diary and no flight school controls it.

  • 355 measured training days a year at this field
  • June mornings are the local weakness; afternoons are strong
  • Examiner diaries are independent of the school
  • A lost day is rescheduled, not billed
Preconditions

What Has To Be True For A Fortnight To Stay A Fortnight?

Five things, none of them slogans. A compressed course that depends on a borrowed airplane, one qualified instructor and forgiving weather is a compressed course that quietly turns into a two-month course.

A Twin That Belongs To The Operation

The Seminole is owned and sits on this field. A school chartering its twin in cannot guarantee tomorrow morning, and that single fact is what turns a fourteen-day plan into a six-week one.

👥

More Than One Qualified Instructor

Eleven flight instructors across the operation. A block schedule collapses the moment the only person legally able to teach you is on leave, ill, or already flying with somebody else.

📋

Instructors Who Already Clear The Multi Bar

Five hours as pilot in command of that exact make and model is the bar 14 CFR 61.195(f) sets before an instructor may teach toward a rating in it. Ask which of the staff clear it before you commit two weeks of your life.

Weather That Actually Cooperates

355 training days a year measured from NOAA ASOS observations at this field, counting only days holding 3,000 ft of ceiling and 5 sm of visibility across four qualifying daylight hours. Tempo is what makes a short rating short.

📆

An Examiner Booked Early

We aim the practical test date from the first week rather than the last, because a rating finished on day eleven that then waits nine days for an examiner was not really an accelerated course.

💰

A Price That Does Not Track The Calendar

$5,100 whether the block runs long or short. A course priced by the hour has an incentive to run slowly, and a course priced by the rating does not.

Contingency

What Happens When Weather Takes A Day Out Of The Middle?

The day is rebuilt rather than lost. Ground instruction moves forward, the Redbird MCX takes the drills that do not need the airplane, and the flying slides. Because the simulator is full-motion and fully enclosed it is never scrubbed for cloud, which makes it genuinely useful for identification drills, flows and checklist discipline — the parts of an engine failure that are cognitive rather than aerodynamic.

We are equally clear about what the simulator is bad at. It does not teach you what a real asymmetric departure feels like through the seat, and it is weak on landings. Anyone selling simulator time as a substitute for the airplane on a twin course is selling you the easy half.

If the weather takes several days rather than one, the block extends and the price does not move. You are not billed for the extra flying and you are not charged for the rescheduling. That is the practical meaning of a fixed price on a course whose length is genuinely uncertain, and it is the reason we would rather quote a rating than an hour count.

A row of twin-engine and single-engine training aircraft on the ramp at first light with mountains beyond
The Price

Does Accelerated Training Cost More?

No. $5,100 is the multi-engine add-on whether you fly it in eleven days or spread it across three months, because it is priced as a rating rather than as a block of time. Tempo changes your calendar, not your invoice.

Most Enrolled

Multi-Engine Add-On

$5,100

The rating, flown at whatever tempo suits you. Consecutive days is the tempo we recommend, and it costs the same as any other.

  • Seminole time flown to practical test standard
  • An instructor on every hour of it
  • Systems ground instruction across the first days
  • Rescheduling after weather, at no charge
  • The 61.63(c)(1) endorsement
  • Unchanged if the block runs long
See The Full Cost Breakdown

Multi-Engine Discovery Flight

$499

A fixed-price first flight in the twin. Worth doing before you book two weeks away from work rather than after.

  • Hands on the controls of the multi-engine trainer
  • Credited in full against a program you enrol in inside a day
  • The obvious test of a fortnight-sized decision
Book The Multi-Engine Flight

Redbird MCX Session

$189

Full-motion and fully enclosed, so it never loses a day to weather. What a scrubbed afternoon turns into.

  • Identification drills, flows and checklist discipline
  • Never cancelled for cloud or wind
  • Weak on landings, and we say so
Book A Simulator Session

Airline Career Track

$89,000

The whole route flown at this tempo, phase after phase, at one published price.

  • Private, instrument, commercial, multi, instructor
  • Financing from $2,500 down
  • Nothing repriced at a phase boundary
Read The Career Track Page
No hourly figure for the Piper Seminole is published anywhere on this site. The $499 discovery flight is a fixed-price flight and not a rate. The one hourly rate published here is $179 wet in a single-engine airplane for students already enrolled, covering the airframe and its fuel and never the instructor. Outside the $5,100 sit three things named in full on the cost page: the examiner, your medical certificate, and the equipment you buy for yourself.
Also Compressible

Which Other Ratings Can Be Flown In A Block?

Not all of them, and the difference is whether a knowledge test stands in front of the practical. Where one does, the calendar is set by a testing centre rather than by you.

Fastest To Compress

Multi-Engine Add-On

$5,100

The most compressible rating on the route, because nothing has to be sat at a testing centre first.

  • No knowledge test under 61.63(c)(4)
  • No training-time floor under 61.63(c)(3)
  • Ten to fourteen days is ordinary
Read The Rating Page

Instrument Rating

$11,700

Compressible, but the written comes first and that sets your earliest possible start date.

  • Knowledge test required before the practical
  • Actual instrument conditions available at this field
  • Worth holding before the twin
Read The Instrument Rating Page

Accelerated Private Pilot

$15,900

The Comprehensive program flown as a block. Longer, and more dependent on weather across a wider spread of tasks.

  • 60 logged hours, 5 in the Redbird
  • Knowledge test required
  • Solo cross-country weather is the usual constraint
Read The Accelerated Private Page
Every figure above is a package price set at enrolment. Nothing on this site is quoted as a range and nothing sits behind an enquiry form.
The Trade

Is Accelerated Training Better, Or Only Faster?

For this particular rating, genuinely better, and we will name the cost rather than pretend there is not one. Better because engine-out handling is a reflex and reflexes are built by close repetition. Better because the systems picture stays assembled. Better because two weeks of momentum carries you through the plateau that weekend students hit around the sixth or seventh failure drill, where nothing seems to be improving and the temptation to postpone a lesson is strongest.

The cost is concentration. A fortnight of two flights a day plus evening study is demanding, and it is demanding at exactly the moment you are being asked to learn the least forgiving handling in light aircraft flying. Some people are better served by three flights a week for a month. If you are one of them we will say so, and the price is the same either way, so nobody here has a financial reason to push you toward the schedule that suits us.

There is also a practical trade nobody mentions: two weeks away from work is expensive in ways that do not appear on a flight school invoice. Count that honestly before you book. Sometimes the slower tempo is the cheaper one once the whole ledger is on the table.

A Piper Seminole standing on the flight line in warm low sunlight with the rest of the training fleet behind
Two Tempos

Consecutive Days Or Weekends?

The same rating, the same standard and the same price, reached two different ways. What changes is total flying hours, elapsed calendar and how much of your life the course occupies while it runs.

RecommendedTempo One

Consecutive Days

Ten to fourteen days, two flights most days, ground work in between and in the evenings.

Best forsomeone who can clear a fortnight and wants the rating finished

  • Elapsed Time10–14 days
  • Typical Aircraft HoursNearer 10 than 15
  • Skill Retention Between LessonsHigh
  • Demand On YouHeavy while it runs
  • Price$5,100
See What $5,100 Covers
Tempo Two

Weekends Only

Two or three months, one or two flights a week, with the systems material revisited each time.

Best forsomeone who cannot leave work, or who prefers a slower load

  • Elapsed TimeTwo to three months
  • Typical Aircraft HoursNearer 15 than 10
  • Skill Retention Between LessonsLower — expect revision
  • Demand On YouSpread out
  • Price$5,100
Read The Rating Page

Side By Side

Consecutive DaysWeekends Only
Elapsed TimeTen to fourteen daysTwo to three months
Aircraft Hours Typically NeededNearer tenNearer fifteen
Revision Time Each LessonMinimalSubstantial
Weather Risk Per DayConcentratedSpread
Time Off Work RequiredTwo weeksNone
Price Here$5,100$5,100
Comparing Offers

How Do You Judge Another School's Accelerated Course?

Ask three questions and you will learn more than any brochure will tell you. First: is the twin owned or chartered? A borrowed airplane cannot support consecutive days, and no amount of scheduling software fixes that. Second: how many instructors on staff already hold the five hours in make and model that 14 CFR 61.195(f) demands before they may teach toward the rating? If the answer is one, the course is one person's holiday away from becoming a two-month course.

Third, and most revealing: what happens to the price if the block runs long? A course priced by the hour has a quiet incentive to run slowly, and a course priced as a rating does not. Ask for the answer in writing rather than in conversation. No school is named on this site and no competitor's figure appears here; these are simply the three questions whose answers actually predict how your fortnight will go.

One more, if you are comparing quotes across the whole cluster: check whether you are being quoted for a class rating under 61.63(c) or for a commercial certificate flown in a twin under 61.129(b). The second contains roughly thirty hours of multiengine flying the first does not, and that difference explains most large gaps without anyone being at fault.

Owned or chartered?How many multi instructors?What if it overruns?
Nose three-quarter view of a lime-green Piper Seminole twin-engine trainer standing on the flight line
Checkable

What Would You Verify Before Booking Two Weeks Off?

Four facts, each confirmable by asking a direct question and expecting a direct answer. A compressed course lives or dies on structure, and structure is the thing you can check in advance.

355

Training Days A Year, Counted At This Field

Derived from NOAA ASOS observations across the twelve months ending 1 August 2026, counting only days that held 3,000 ft of ceiling and 5 sm of visibility over four qualifying daylight hours. A fortnight course depends on this number more than on anything we could say about ourselves.

NOAA ASOS via the Iowa Environmental Mesonet
11

Flight Instructors, So One Diary Cannot Stop The Block

Each carries a commercial certificate or an ATP, then a flight instructor certificate on top, then a current medical. Each is also, legally, the pilot in command of your flight. Depth of staff is what lets a block schedule survive an ordinary week.

FAA Airmen Registry · 14 CFR 61.23
1

A Twin Owned By The Operation

The Piper Seminole belongs to the school and sits on this field. Because it is used to give instruction for hire it carries the inspection regime that rule imposes, and because it is not hired in, tomorrow morning is ours to promise.

14 CFR 91.409(b)
5

Make-And-Model Hours Behind Every Multi Instructor

14 CFR 61.195(f) keeps an instructor out of multiengine rating instruction until five hours as pilot in command of that exact make and model are logged. Worth asking how many people on a staff clear it before you commit a fortnight.

14 CFR 61.195(f)
$0

Charged For A Block That Overruns

Nothing. $5,100 is set at enrolment and weather is our risk to carry. A course that bills the overrun is not really a fixed-price course.

Published in full
Compressed Course Questions

What People Ask About Flying The Twin In A Block

Ten to fourteen consecutive days is the ordinary case at this field, from first lesson to practical test. Nothing has to be booked at a testing centre first, because 14 CFR 61.63(c)(4) waives the extra knowledge test wherever an airplane rating already sits on the certificate at that level, and that removes the biggest calendar delay in every other rating.

No. $5,100 is the price whether you fly it in eleven days or across three months, because the product is a rating rather than a block of time. If anything the compressed route consumes fewer aircraft hours, because a smaller share of each lesson goes on rebuilding what faded since the previous one.

Because most of what it asks you to build is a rehearsed physical response rather than knowledge, and rehearsed responses are built by repetition close together. Recognising an asymmetry, getting the correct foot down, reaching for the right propeller control — these decay between sessions in a way that understanding does not.

The day gets rebuilt. Ground instruction moves forward, the Redbird MCX takes the drills that do not need an airplane, and the flying slides. If several days go, the block extends and the price stays at $5,100. You are not billed for the extra flying or for the rescheduling.

Yes, and plenty of people do. Expect two to three months elapsed and nearer fifteen aircraft hours than ten, because each lesson opens with revision of what faded since the last one. The standard, the syllabus and the price are identical. We will tell you which tempo suits you before you enrol.

Not to start. But 14 CFR 61.45(b)(2) lets a practical test be flown in an aircraft that cannot cover every required task and then issues the rating with a matching limitation, which for a pilot who is not instrument rated reads Airplane Multiengine VFR Only. If you expect to fly instruments in a twin later, take the instrument rating first.

Usually two flights, rarely more, with ground work between them. Twin flying is dense and tiring, and a third flight in a day tends to teach nothing that sticks. Fatigue is the real limit on a compressed course, not the airplane's availability.

We aim the practical test date from the first week rather than the last, because a rating finished on day eleven that then waits nine days for an examiner was not really an accelerated course. A designated pilot examiner runs an independent diary, so the date is aimed at rather than promised.

Fatigue, and it matters more here than elsewhere because the least forgiving material sits in the middle of the block. A tired student learns engine-out handling badly, which is the worst possible thing to learn badly. We would rather scrub an afternoon than fly a session that will not stick.

Broadly yes, phase by phase, though the ratings with knowledge tests in front of them are governed by testing centre availability rather than by your schedule. Every certificate and rating in one sequence is published at $89,000, with deposits starting at $2,500.

Fly the twin once. The $499 multi-engine discovery flight is a fixed-price flight in the Seminole with an instructor, hands on the controls and loggable, and it answers the question a fortnight of annual leave is riding on. Enrol inside a day and the whole fee comes off the program price.

On this rating, the evidence of everyday instruction points the other way, because engine-out handling responds to concentration rather than to elapsed time. What a block cannot give you is exposure to varied weather and varied days, so the honest answer is that it produces a sharper drill and a narrower experience.

Before You Book Leave

Fly The Twin Once Before You Clear Two Weeks

A fixed-price first flight in the Piper Seminole, hands on the controls, logged as instruction. Two weeks of annual leave is a large bet on an airplane you have never flown, and this is the cheap way to check the bet before you place it.

Multi-Engine Discovery Flight
$499
Credited in full against a program you enrol in inside a day.
See What $5,100 CoversOr call (747) 688-9988
Before you spend anything

Fly The Aeroplane Once, Then Decide

The assessment flight is the first hour of the syllabus and a two-way evaluation. You fly it from the left seat with an instructor beside you, they write down what they saw, and you get an honest read on whether the plan is realistic. It is loggable, and it is credited in full against enrolment if you enroll within 24 hours.

What happens on an assessment flight →

6 aircraft types, owned in-house 355 flyable training days, measured at Van Nuys Every price published on the page
7900 Balboa Blvd, Suite 108, Van Nuys, CA 91406 · (747) 688-9988 · text· 9am to 9pm, seven days
Assessment flight
$229
60 minutes, left seat, loggable. Credited in full against enrolment within 24 hours.
Choose a time